Bathroom Remodeling Process: What Happens In A Bathroom Remodel

Bathroom remodeling is not an easy task. It involves a lot of time, planning, and working to get things done the way you want. Here is how a bathroom remodeling process goes.

Planning The Remodel

First things first, you need to plan how you will do the remodeling work. This is going to be the master plan of the remodeling project. You need to plan things first, before thinking about demolishing the entire place. You need to plan about what things need changing, what you need to save and salvage, and other things like that.

The planning phase is what takes the most time because this is where you will come to a decision on whether the bathroom needs a major remodeling or not. You can also get help from the contractor in the planning process if you are confused and don’t know what or where to renovate first.

Demolition

After the planning, comes the demolition phase. This is where you will need to get your things ready and then the contractor can start to demolish the bathroom or at least areas where remodeling is needed. This is also the time when you will need a temporary bathroom elsewhere, since your current bathroom will not be usable for some time, depending on the remodeling project.

Demolishing is pretty self-explanatory. You will demolish and tear down everything that needs to be replaced, so you can start remodeling from the ground up. The areas which aren’t being demolished need to be protected during this time.

Plumbing And Electrical Work

Once everything in your bathroom is torn down and ready for remodeling, you need to look at the underground work first. This is where all of the plumbing, water pipes, and electrical networks are. These things need to be looked over first so that they can be done and tucked away under the flooring.

You need to do this before installing the floors because this is something hard to reach if you install the floors first. So, get the electric and plumbing work done, and then you can move on to the next step.

New Installations

Once all of the underground and wall work is done, you can install things like walls, floors, and other things. Keep in mind that this is not the time to install new things like a toilet and shower. Those things are done after the bathroom walls and flooring are done.

First, you need to take care of the tiles and floors. Make sure that you have everything ready to go because delays can add a lot of overhead costs to your entire remodeling bill. Make sure that you have every material and installation ready to go, so that they can be installed and fitted in one go.

External Installations

Now comes the part where you want to think about the new installations which go over the walls and floors. These things include your shower cubicle, a bathtub if you want one, a toilet, new countertops, and other things. These are called external installations because you don’t need to prep anything beforehand, as these things will go directly on top of the floors and walls.

You can also install new sinks, mirrors, and other additions to your bathroom to make it look modern, stylish, and according to your preferences.

Don’t Forget The Lightsti

Last but not least, you need to install the lighting fixtures. These are saved for last, because they are, again, external installations, and they can be easily placed or screwed on, once the whole remodeling is done. Make sure that you make light a priority in your bathroom.

The right light is going to give your bathroom a luxurious look and it will give the illusion of a bigger space. If you already have a lot of windows in your updated bathroom, then that’s great, but adding extra light fixtures won’t hurt and will make your space brightly lit.

Conclusion

There you have it! This process is just a step-by-step guide, which is going to give you a good direction on what to start with first. Your remodeling project will be done in no time given that you plan it correctly and hire expert bathroom remodelers Rockville.